On this page you can find out all about how our installation service works.
Depending on the work you’re having done depends on the time needed to complete. A fully tiled bathroom with recesses, feature tiles and a wet room, will take longer than a half-tiled bathroom where products are being replaced like for like. Roughly we would say anywhere between 7 and 14 days.
If your new toilet is going back in the same place, then we will temporarily fit this for you in a few hours (if needed). If you are having a new configuration and this is your only toilet, then a toilet will be there for you to use at the end of the first day, but it may be without a cistern so you’d manually flush it with items we’d leave for you
Our employed Wakefield Bathrooms installation team will install your new bathroom. We don’t use sub-contractors; we have complete control over the installation from start to finish. Any electrical / plastering works required are carried out by our approved tradesman that we’ve been working with for many years.
This depends on our diary at the time of booking, if you speak with our team they’ll be able to advise you.
Yes we do. Our employed installation team take care of everything from the rip out of your old bathroom, to the installation of your new bathroom. All electrical work / plastering / decorating in coordinated by us, so you don’t have to worry about arranging anything.
All of our quotes include the price of a skip or a rubbish removal service that is required. If you’d prefer to remove the rubbish yourself then please let us know.
Always. We use premium floor coverings to ensure they are kept clean and protected.